Septic System
Design Back to
Septic Systems Bayer-Risse Engineering, Inc. is dedicated to providing
our clients with a complete professional service throughout the septic system
design process. We are well versed in the specific requirements of
Township/County/State regulations pertaining to the design and installation of
septic systems. Our staff will manage all the phases of the septic system
permitting process including soil testing, design and construction
inspections/final certification. Too often the pressures and stress of
a real estate closing are compounded by the discovery of a failing septic
system. Our approach is to proactively manage each phase of the septic system
design, permitting and installation process. This not only alleviates the
burden on our client, but also enables us to streamline the process to ensure
that the project is completed in a timely fashion to the satisfaction of all
parties involved. In doing so, we have achieved great success and developed a
strong reputation with health departments, attorneys, real estate agents,
contractors and our customers. The septic system "process" begins with
the soil-testing phase. Excavation with a backhoe is necessary to establish the
design requirements for the new septic system. Before the first shovel hits the
ground, we assess the site for construction accessibility, setback requirements
and environmental constraints. Our extensive experience in the design and
construction phases plays a key role in the planning and proper location of the
soil tests. The skillful planning that we provide at the soil-testing phase is
a core component in optimizing the permitting cycle as well as reducing the
overall project cost.
 The design phase proceeds immediately following soil
testing. We work expeditiously to generate the design plans and application
report. We have consistently refined our design concepts over the years based
on feedback that we have solicited from area contractors and various health
departments. Our designs are regarded as one of the most thorough and well laid
out sets of plans available in the industry. Upon completion of our plan set
and application report, we present the application to the local health
department for approval. We simultaneously solicit construction cost estimates
from reputable area contractors on our client's behalf. We assist our clients
with comparing construction cost estimates so that they may make an informed
decision during their selection of the construction contractor. Ideally, this
process of selecting the contractor to construct the system is completed just
as the health department issues the permit.
Once the permit is issued
and a contractor is selected, the construction phase begins. This is where all
of the careful planning and experience pays off. We work through the entire
construction process with your selected contractor to ensure that the system is
constructed as designed. Our seal of approval on the final documents is your
assurance that you have effortlessly made your way through the septic system
process with the knowledge that the design represents the most respected and
cost effective solution to your wastewater needs. |